BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//CERN//INDICO//EN
BEGIN:VEVENT
SUMMARY:Installation of a PLC in the ANTARES accelerator terminal
DTSTART:20221019T025000Z
DTEND:20221019T031000Z
DTSTAMP:20261109T173800Z
UID:indico-contribution-5004@events.synchrotron.org.au
DESCRIPTION:Speakers: Andrew Downes (ANSTO)\n\nThe ANTARES 10MV accelerato
 r at ANSTO was originally built in the 1960’s. The terminal was upgraded
  in the 1990s and early 2000s. It was very basic in operation due to the h
 arsh operating environment and technological limitations at the time. Tech
 nology and user requirements have changed significantly since then and a n
 eed was identified to increase the capabilities. This presentation discuss
 es the installation and testing of a PLC in the terminal and the challenge
 s of protecting it from the effects of high voltages.\n\nhttps://events.sy
 nchrotron.org.au/event/160/contributions/5004/
LOCATION:ANU
RELATED-TO:indico-event-160@events.synchrotron.org.au
URL:https://events.synchrotron.org.au/event/160/contributions/5004/
END:VEVENT
END:VCALENDAR
