14–17 Sept 2015
MCEC
Australia/Melbourne timezone

First LHC Emittance Measurements at 6.5 TeV

16 Sept 2015, 10:10
20m
105 & 106 (MCEC)

105 & 106

MCEC

1 Convention Centre Place, South Wharf VIC 3006, Australia
Contributed Oral Transverse Profile Monitors WEALA

Speaker

Maria Kuhn (CERN)

Description

During LHC Run 1 significant transverse emittance growth through the LHC cycle was observed. Measurements indicated most of the blow-up to occur during the injection plateau and the ramp. Intra beam scattering was one of the main drivers of emittance growth. However, finding a good wire scanner working point was difficult. Photomultiplier saturation added uncertainty on all measurements. A large discrepancy between emittances from wire scanners and luminosity was discovered but not solved. During Long Shutdown 1 the wire scanner system was upgraded with new photomultipliers. In April 2015 the LHC re-started with collision energy of 6.5 TeV per beam. This paper presents the first transverse emittance measurements through the LHC Run 2 cycle with low beam intensity. Comparisons with data from the synchrotron light monitors and the LHC experiments will be discussed and results summarized. In addition, a thorough study of wire scanner photomultiplier saturation will be presented. Finally, the emittance growth results will be compared to intra beam scattering simulations.

Author

Presentation materials