14–17 Sept 2015
MCEC
Australia/Melbourne timezone

Session

MOBLA

MOBLA
14 Sept 2015, 11:00
MCEC

MCEC

1 Convention Centre Place, South Wharf VIC 3006, Australia

Conveners

MOBLA: Overview and Commissioning

  • Kay Wittenburg (Desy)

Presentation materials

There are no materials yet.

  1. Pei-Chen Chiu (NSRRC)
    14/09/2015, 11:00
    Overview and Commissioning
    Invited Oral
    The TPS is a newly constructed 3-GeV third-generation synchrotron light source featuring ultra-high photon brightness with extremely low emittance. After some hardware improvement especially demagnetization of chamber are completed, the commissioning of the beam in the booster ring began on December 12 and attained 3-GeV energy on December 16. The storage ring obtained its first stored beam...
    Go to contribution page
  2. Alexander Aleksandrov (ORNL)
    14/09/2015, 11:40
    Overview and Commissioning
    Contributed Oral
    The Spallation Neutron Source, a neutron scattering user facility based on a 1.4MW proton accelerator, has been in operation since 2006. The accelerator beam diagnostics were designed, in large degree, with commissioning unknowns in mind. Today we face new challenges to support stable 1MW beam power operations and accelerator upgrade for even higher power. The beam instrumentation problems...
    Go to contribution page
  3. Volker Schlott (PSI)
    14/09/2015, 12:00
    Overview and Commissioning
    Contributed Oral
    SwissFEL is an X-ray free electron laser user facility presently under construction at the Paul Scherrer Institut (PSI) in Villigen, Switzerland. All diagnostics systems have been developed and successfully tested within the baseline SwissFEL parameters, including a low charge, ultra-short pulse operation mode. The monitor designs have been finished, production is ongoing and most of the...
    Go to contribution page
Building timetable...