OPAL - Thermal Neutron Guides TNG1 adn TNG3 Replacement

Speaker

Kristian Veronika (ANSTO)

Description

During the 2019 major shutdown, ANSTO has set up a project to remove existing Thermal Neutron Guide (TG1-3) in-pile assembly and replace it with a new in-pile assembly containing an additional TG-2 A/B in-pile guides. The purpose of this presentation is to provide following: - Brief description of ANSTO neutron guide configuration; - Improvements made to enable easier future guide installation /removal - Provide overall project progress in preparation for the replacement.
Formal Invitation Letter Required No

Primary author

Kristian Veronika (ANSTO)